Marine Riparian Restoration Workshop, Thetis Island BC 2018
Successful installation of bio-engineering called wattle wall technique using living willow stacks to stabilize the collapsed portion of the bank. (photo credit not known).
Completed wattle wall, live-staked, bio-engineered wall used as a restorative measure to stabilize the collapsed bank. (photo taken by D. Tarris, 2018).
The day of completion, wattle wall technique. Oct 28, 2018. (photo taken by D. Tarris, 2018)